Low-, medium-, high- and extra-high-voltage cables for substations, industry and cable routes. Working throughout the year in Austria and Germany on new construction, renewal and grid reinforcement.
Low to extra-high voltage · Working throughout the year
We carry out cable pulling and installation for energy, industrial and infrastructure projects. This includes high- and extra-high-voltage cables, long cable routes, substations and installations in tunnels and galleries.
Pulling and payoff equipment is selected to suit the cable, drum and route. During installation, we monitor pulling forces and observe the manufacturer’s bending radii. Sheath voltage measurements and installation and test records follow the agreed inspection plan.
Temporary construction cables: Drum logistics, installation, cable bridges and dismantling are coordinated with the other work. More about temporary construction cables.
ISO certifications & training · Our fleet & equipment
For cable installation we use our own cable pusher and specialised transport equipment. Our Mercedes-Benz Arocs with low-loader and hydraulic payoff system handles cable drums up to 110 tonnes.
Before work begins, we coordinate the route, logistics, pulling equipment and interfaces on site. Project-specific method statements and risk assessments (RAMS), together with appropriate briefings, support execution.
Discuss the cable type, route length, drum weights and planned schedule with us. We will select the appropriate equipment for your project.
Temporary connections
We install and remove temporary cable connections, secure the route and organise cable-drum logistics.
















Send us the location, scope of work and planned schedule. We will coordinate the next steps with you.